PerryLink/dsh-railway-window ↗★ 0

dsh-railway-window

铁路施工天窗台账核对(按时间窗、时长算术与命令号核对台账自洽,仅提示差异,不作出定性结论) 适合铁路施工管理人员,用于核对天窗台账的时长算术与命令号。

パッケージ
dsh-railway-window
互換性
未検証
Harness ピア範囲
>=0.1.2-rc.1 <0.2.0 || >=0.2.0-0 <0.3.0
Cordis ピア範囲
^4.0.2
バージョン
0.2.1
ライセンス
NOASSERTION
最終更新
2026/10/08

インストール

$npx -p @deepseek-ai/dsh dsh plugin --profile web add github:PerryLink/dsh-railway-window

ドキュメント

README 全文を読む ↗

Configuration

KeyTypeDefaultDescription
rulesFilestringrules/railway-window.yamlRule-pack path, relative to the package root
disabledRulesstring[][]Rule ids to stop running; each appears in skipped
onlyRulesstring[][]Run only these rule ids; empty runs every rule
skipNotesstring""Note appended to every skipped reason
timeoutMsnumber120000Cooperative tool timeout budget

Rule-level parameters worth knowing:

  • RW-002 field / notAfterField — the time pair, start against end.
  • RW-003 daysField / fromField / toField / tolerance — the duration arithmetic, in days. The default tolerance is 0.01 day.
  • RW-005 values — your window types, e.g. [V 类, 垂直天窗, 综合天窗, 施工天窗, 维修天窗]. Empty means no check.